CASE STUDY
Rehabilitation of Existing 28” dia. Buraimi Water Pipeline, Oman
Buried Coatings
Project Data
Location | Oman |
Client | DIAM (Public Authority for Water) |
Products | Denso Paste™, Densyl™ Tape applied spirally with a 55% overlap, Denso™ PVC Self-Adhesive Tape 200 (Yellow) applied with 2 No. 55% spiral overlaps (4 layers). |
Contractor | Flown Modern LLC |
Distributor | Bin Moosa Trading & Contracting LLC |
Date | August 2022 |
Project Details
DIAM’s aim is to ensure the provision of high quality, sustainable and reliable potable water services to all people in the Sultanate of Oman. Diam’s Mission: Working towards establishing water transmissions and distribution networks and applying systems to manage them efficiently.
The project required the repair of the existing 3LPE coating at locations on the pipeline which runs adjacent to the sea, below sea level, so it is in constant contact with highly (saline) salty water. Since the pipeline carries water under high pressure (25 bar) and considering its age, the end user wanted a solution that would provide long-term protection without having to abrasive clean the substrate in this challenging location.
The Densyl™ Tape System was selected because of its ability to perform under challenging conditions being extremely surface tolerant.

Denso PVC Self Adhesive Outerwrap being applied over Densyl Tape

A section of 28" diameter pipe that was identified as needing repair to the existing coating

Densyl Tape being wrapped spirally around the pipe that had been prepared with Denso Paste

Yellow PVC Outerwrap being wrapped on top of the Densyl Tape.

Denso PVC Self Adhesive Outerwrap being applied over Densyl Tape

A section of 28" diameter pipe that was identified as needing repair to the existing coating

Densyl Tape being wrapped spirally around the pipe that had been prepared with Denso Paste
